91精品人妻一区二区三区蜜桃,最新中文字幕av,国产女人18毛片水真多精选,丰满人妻一区二区三区四区视频

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Hot vacuum test chamber

  • Hot Line:18322499311

  

Hot vacuum test chamber

1、 Product Introduction:


The purpose of the Hot vacuum test chamber is to conduct thermal cycling tests on specimens under vacuum conditions.


The hot vacuum test chamber includes the following components:


-Vacuum container, vertical box, hinged door.


-Vacuum box size: 400mm × 400mm × 200mm (width * depth * height), quantity is 3.


-Dimensions: Approximately 1500mm × 1500mm × 1800mm (width * depth * height)


2、 Box:


The shell of the hot vacuum test chamber can withstand external pressure (vacuum). The shell in contact with High vacuum inside the test chamber is made of 304L stainless steel, with a thickness that ensures structural and dimensional stability. All inner surfaces have been treated with material venting and sealed internally. All hardware inside the test chamber is made of stainless steel or high vacuum materials.


3、 Vacuum system:


Control principle: The pressure transmitter detects the pressure inside the working chamber and compares the detected pressure signal with the set value of the control instrument after amplification, analog-to-digital conversion, and nonlinear compensation. The deviation signal generated from this is used to control the opening and closing of the solenoid valve, keeping the pressure in the working chamber within a certain range.


Pressure sensor armored pressure transmitter


1 set of vacuum pump; When the pressure drops from atmospheric pressure to 10Pa, the mechanical pump starts to rapidly reduce the pressure. It will take approximately 1 hour


When the pressure drops from 10 Pa to 10-5 Pa, the molecular pump begins to decrease in pressure. It will take about 3 hours


The vacuum unit can simultaneously connect three experimental chambers and evacuate them. If you want to vacuum each experiment separately, just open the valve. In order to better meet the requirements of independent vacuum pumping, we have equipped three molecular pumps connected to three chambers, achieving fast, stable, and high-precision results.


4. The control method adopts dynamic pressure balance to achieve dynamic balance control in the continuous operation of the vacuum system. The control system automatically controls the operation of the vacuum solenoid valve and vacuum pump (including frequency converter) according to the pressure setting value, and adjusts the amount of suction/intake to achieve the requirements of dynamic pressure balance.


The vacuum system has the following functions (to maintain cleanliness inside the box and without test specimens):


Pressure range: 1 atmosphere~5 * 10-5 Pa


Ultimate pressure: ≤; 5.0 × 10-5pa (under no-load and normal temperature conditions), arrive within 3 hours after operation.


Test pressure:


≤; 1.0 × 10-4-pa (with load, under the condition of box temperature of 80 ℃);


Vacuum extraction time (from 1 atmosphere to 5 × 10-4 Pa): approximately 4 hours.


Vacuum acquisition time: within 1 hour after operation (with load) ≤; 1.0 × 10-3-pa, ≤ after 2 hours; 1.0 × 10-4-pa. Start extracting vacuum from atmospheric pressure.


The vacuum system includes a main pump (mechanical pump) system, consisting of three sets of molecular pumps and one set of mechanical pumps; After setting the vacuum degree of the equipment, it can control automatic vacuuming.


It also includes a set of connecting pipes for vacuuming and vacuum control; There are also valves, accessories, vacuum sensors, and interlocking devices that can ensure normal operation, monitoring, and safety.


The main pump system consists of the following parts:


Vacuum pump, model: 620C


Vacuum pumping rate: 300L/S


Ultimate voltage division:< 6*10-1 Pa .


Mechanical pump RT-250, equipped with frequency converter


Vacuum pump unit


Vacuum sensor


Pirani and MKS 974 vacuum sensors installed on the system will be tested.


The installation interface will include two vacuum gauges (model: ZJ-27) and two ionization vacuum gauges (model: ZDR-27B) for measuring high vacuum pressure (less than 10-3 Pa)


Note: In order to achieve safe operation, the entire vacuum system will be equipped with interlocking devices.


Re pressure system of hot vacuum test chamber


Thermal cycle system


A non sealed circulation system can eliminate all leakage risks caused by seal wear. In addition, this configuration reduces heat transfer from the motor to the fluid.


The electric heat exchanger consists of multiple isolated heaters and is PID controlled by an independent over temperature safety switch.


Thermal cycle system performance


The performance of the thermal cycling system is as follows:


Equipment temperature range RT+15 ℃ -150 ℃


Equipment control accuracy ≤; ±2℃


Temperature deviation ≤; ± 2 ℃ (calibration according to JJF1101-2003)


Uniformity


≤; 2 ℃ (calibration based on JJF1101-2003)


Volatility ≤; ± 1 ℃ (calibration according to JJF1101-2003)


The equipment layout control box and test box are integrated, and the testing space is located above the equipment, divided into three experimental chambers and one storage cabinet.


Sealing strip: Silicone sealing strip


The test box door is installed in front of the test box, and an observation window is set on the door


Set up power cable holes and main power switch behind the equipment


Install mobile casters and positioning foot cups at the bottom of the box


The oil return system is equipped with a 1101A condensing device at the end of the corrugated pipe. When oily substances pass through the pipe, the electric heating bag will heat them up, causing the oil to quickly evaporate and trigger the condenser to turn into liquid oil and be discharged. Will not enter the experimental chamber.


The filter device has 180 pleated layers on both sides of the filter material. The high-temperature resistant and efficient filter is made of ultra-fine glass fiber filter paper, aluminum foil partition plate, galvanized frame or stainless steel frame, and sealed with imported high-temperature resistant sealant Low resistance, high efficiency, good high temperature resistance, can work normally at 200 ℃, effectively preventing air suspended particles above 0.5um from entering the cavity. Depending on the frequency of use, replacing the filtering device takes 1-3 years


The inner box is made of SUS304 # stainless steel plate, which is cut using precision laser cutting equipment and bent into shape using a CNC bending machine. It is then fully welded using argon arc welding, polished and finished; The steel plate is 2mm thick


The insulation material is made of polyurethane rigid foam and glass fiber cotton, with a thickness of 100mm. It has better insulation performance than ordinary insulation cotton, saving electricity and reducing the impact on the ambient temperature of the equipment


Box door single door, explosion-proof handle


Anti condensation electric heating device


Vacuum automatic defogging transparent window, window lighting


Insulation layer rigid polyurethane foam+glass fiber


Observation window transparent electric heating film insulated tempered glass (located on the door) (with anti condensation function), size 200X150mm


Each experimental chamber has an observation window


Distribution control cabinet main power circuit breaker, controller, distribution board, cooling fan, over temperature protector


Distribution panel


The heating system adopts a scale heat dissipation heating tube P I. D controls heating to achieve temperature equilibrium


The heater is made of exposed spiral nickel chromium heating wire and insulated ceramic bracket, with low surface load, sensitive temperature control, and small temperature hysteresis.


Heater control mode: PID+PWM+ SSR, Solid state relays are used for contactless zero crossing triggering to drive heaters, with no contact sparks or noise, and a long service life.


Controller, capable of separately controlling parameters such as temperature, vacuum degree, and time for three vacuum boxes


LCD display touch screen


Program capacity and available program quantity for control functions: up to 120 groups, one program can be combined from 1 to 99 segments


Usable memory capacity: 1200 segments, can execute commands repeatedly: each command can be executed up to 999 times, program slope can be set by the timeline, programs can be linked and used, and program creation adopts conversational operation with simple operation


Equipped with functions such as editing, clearing, and inserting, with 4 sets of time signal output control (controllable control of the ON/OFF action of the test object)


It has 9 sets of PID parameter settings, with jump and hold functions during program execution, and can display curves and obtain data; Date and time adjustment function; Button and screen lock (LOCK) function, can be connected to a computer for use


RS-485 communication interface can be used as a monitoring and remote control system to record test data


Running mode, program mode/fixed value mode


Setting method: Chinese interface, touch input


Set the maximum temperature range with upper and lower limits of 5 ℃


Display resolution temperature: 0.01 ℃; Humidity: 0.1%; Time: 1min;


Protection function: independent studio, over temperature protection, vacuum pump overload protection, leakage protection, power supply phase loss and phase sequence error protection, test box shell grounding protection, over temperature alarm, over temperature automatic power-off function, etc


The power-off memory function can set the power-off recovery mode to: hot start/cold start/stop


Input PT100 platinum resistor


The curve recording function has RAM with battery protection, which can save the set values, sampling values, and sampling time of the device; The maximum recording time is 60 days (when the sampling period is 1.5 minutes)


Software usage environment: IBM PC compatible machine, CPU with P Ⅱ or above, 128MB or above memory, Simplified Chinese Windows 2000 or Simplified Chinese Windows XP operating system


Imported nickel chromium alloy electric heater


Heater control method: contactless equal period pulse width modulation, SSR (solid-state relay)


Control method: anti integral saturation PID, BTC balance temperature control method (temperature testing equipment)


BTHC Balanced Temperature and Humidity Control Method (Temperature and Humidity Testing Equipment)


Set range temperature: Adjust according to the temperature working range of the device (upper limit+5 ℃, lower limit -5 ℃)


Input platinum resistor


Supplementary functions


(Standard configuration) Fault alarm and cause, processing prompt function


Power outage protection function


Upper and lower temperature protection function



Recommended products

国产中文字幕一区二区三区| 欧美成人精品一区二区三区免费| 蜜臀久久精品| 国产精品对白一区二区三区| jizzjizz亚洲丰满熟女| 97人人澡人人爽人人爽| 国产精品久久久精品| 孕妇孕交视频保胎| 亚洲欧美国产一区二区三区| 国产精品久久久久久久久久10秀| 亚洲精品国产精品国自产网站按摩| 人妻侵犯一区二区三区乱码图片| 精品人妻| 乱精品一区字幕二区| 国产精品剧情在线观看| 亚洲国产精品欧美久久| 1000部国产精品成人观看| 精品久久久久久18免费网站| 精品久久久久久久久久岛国gif| 97精品国产97久久久久久久久久久久 | 粉嫩xb粉嫩xb粉嫩xb| 一本色道久久亚洲av蜜桃小说| 一本色道久久综合亚洲二区三区| 久久综合婷婷| 99热在线这里只有精品| 国产福利二区| 天天干天天日| 亚洲v欧美v另类v综合v日韩v| 四虎影视在线播放| 天天做天天爱天天爽综合网| 91人妻人人做人人爽蜜臀| 美女又爽又黄免费网站直播| 色婷婷久久一区二区三区麻豆| 国产av专区| 亚洲国产日韩精品一区二区三区| 国产福利在线视频| 91久久精品一区二区| 九九影院午夜理论片少妇| 91精品久久人人妻人人爽人人| 亚洲一级—内射欧美a999 | 欧美乱大交xxxxx潮喷老熟妇|